Replacing the E-SBC Module

The AMC-based E-SBC module is hot-swappable and can be replaced without powering down the device and disrupting other non-related services running on the device.

Warning: Do not remove an AMC module before its hot-swap LED turns solid blue.  Removing it prematurely may cause damage to the device.

Avertissement : Ne retirez pas le module AMC avant que sa DEL remplacée à chaud ne passe au bleu stable. Son retrait prématuré risque d’endommager l’appareil.

To replace the E-SBC module:
1. Remove the failed module:
a. Gently pull the module handle until you hear a click sound. The module is now partially extracted and undergoes a shutdown sequence.

Module Handle Partially Pulled Out (Top View)

b. Wait till the Hot Swap Blue LED_blue.png LED is lit, which indicates that the shutdown sequence has completed.
c. Grip and pull the module handle firmly to slide the module out of the slot.
2. Install the new module:
a. Remove the new module from its ESD shielding packet in which it was shipped.
b. Carefully insert the module into the slot and slide it along the slot's guide rails until it makes contact with the card-edge connector located on the backplane.
c. Using only the module handle, press the module into the chassis to engage it with the chassis backplane.

Module Handle Pushed In (Top View)

d. Connect all external interfacing cables to the module, as required.